Environmental Considerations

Environmental Considerations

The outline planning application, when submitted, will be accompanied by detailed assessments of all relevant effects of the data centre campus upon the local environment. At this outline stage, development and design parameters have been assessed rather than a final fixed scheme. In taking this approach, assumptions have been made as to what the maximum physical scale and maximum operational outputs of the data centre campus could be. Any final scheme proposed at a later stage could not exceed those maximum parameters.

​

We have considered a whole range of environmental factors including: Access and Highways, Water, Ecology and Biodiversity, Local Amenity, Archaeology and Ground Conditions and Energy.

1

Access and Highways

Car Interior

How will the development be accessed?

​

Throughout the construction phase, construction vehicles will access the site from the B1285 to the north. Once operational, the data centre campus will be accessed from two new entrances on the B1285 as shown on the illustrative masterplan. A third access is proposed to be provided onto South Hetton Road to the south. However, use of this third access would be limited to emergencies.

2

Water

Concentric Water Ripples

How much water will the development consume when operational?
 

Water would be consumed by those working at the data centre campus and in the cooling of the apparatus inside the data halls. Tract is working to minimise water consumption and, at this outline stage, there are different options as to how the apparatus could be cooled.

 

The cooler climate of the UK and the North East means that various efficient ways of cooling the data centre are available, including indirect evaporative cooling systems,  or air- only cooled systems (closed loop), or a combination of both. Tract is working with Northumbrian Water to establish the most resource efficient approach. Once the method of cooling is known, Northumbrian Water will ensure that the local network has sufficient capacity. If upgrades are required to water supply infrastructure, Northumbrian Water would carry out those upgrades, funded by Tract.

3

Ecology and Biodiversity

AdobeStock_365026192.jpeg

Are there any ecology issues?

​

Ecology surveys have been carried out to identify the various habitats occupying the site and what ecological value it has. Habitats will be managed during the construction and operational phases to ensure they are not threatened and disturbance is managed to a minimum in line with best practice and legislation.

4

Local Amenity

Image by Christian Bass

How would the development appear from the surrounding area, such as from houses and public places?

​

Detailed, accurate, evaluation of the development’s appearance in the landscape and from public viewpoints, is being undertaken and will be included in the planning application. The proposed buildings at the data centre campus will be carefully sited, orientated and designed within the site, taking account key viewpoints, existing landscape features and opportunities to introduce additional landscaping and visual screening.

 

Careful choices will be made for the external materials (and their colours) on the buildings to suitably reduce their visibility.  A comprehensive landscape masterplan will ensure that new planting is in keeping with the landscape character of the area to further reduce views of the buildings over time.

5

Archaeology and Ground Conditions

Mountain Bike Trail Building - Pickaxe_e

Does the site have any archaeological potential? 

​

An Archaeological Assessment and Geophysical Survey have been carried out and will be submitted with the planning application. These have found no parts of the site with levels of archaeological potential that would impact the layout and construction of the development. Further trial trench digs may prove necessary to determine the most appropriate methods for recording any archaeological remains and avoiding loss of those remains during construction.   

6

Energy 

Image by Nikola Johnny Mirkovic

How much energy will the development use once operational?

​

The proposed data centre campus would require sufficient power to support an electrical capacity of up to 500MW. It is the intention to connect to the National Grid via its 400Kv substation that is under construction at Hawthorn Pit, in close proximity to the south east of the site.   

Find out more about us, and the project, visit our FAQs page below.